PROCESS & OPERATING PHILOSOPHY
Relief collection, knock-out, liquid seal, flare combustion and ignition. The operating sequence, recycle paths, start-up/shutdown cases and normal/turndown behavior are defined before equipment finalization.
UNKA ENGINEERINGEPC CONTRACTORPlant-wide safe disposal system based on credible relief and depressuring scenarios.

Relief collection, knock-out, liquid seal, flare combustion and ignition. The operating sequence, recycle paths, start-up/shutdown cases and normal/turndown behavior are defined before equipment finalization.
Relief valves, headers, KO drum, seal drum, flare stack/tip and ignition panel. Materials, design margins, maintainability, isolation, access, lifting and spare philosophy are coordinated with the approved operating cases.
Normal/start-up/emergency demand, source quality, ambient conditions, operating philosophy, redundancy, storage autonomy and process-consumer priorities.
Relief load study, network hydraulics, radiation/dispersion, P&ID and operating philosophy. The package also includes line/equipment lists, relief and utility summaries, layouts or 3D interfaces, vendor-document requirements, inspection plans and commissioning inputs as applicable.
Duty/standby philosophy, alarms and trips, relief/vent/drain routing, hazardous-area requirements, emergency response and maintainable isolation.
Refineries, gas, chemical and storage facilities. Capacity, product quality, consumption and emissions commitments are confirmed only after the representative feed and project Design Basis are approved.
API 520/521/537, ASME and environmental requirements. The contractual code basis is selected by destination and client specification. ASME/API/TEMA, EN/DIN and GOST/EAC requirements are not mixed without an approved code-equivalency and authority review.
API 520/521/537, ASME and environmental requirements.