METHOD & PROCESS PRINCIPLE
Liquid receipt, pressure storage, vapor equalization, controlled transfer, relief and emergency isolation are integrated.
UNKA ENGINEERINGEPC CONTRACTORPressurized horizontal storage for LPG components and compatible liquefied gases.

Liquid receipt, pressure storage, vapor equalization, controlled transfer, relief and emergency isolation are integrated.
ASME bullets, saddles, relief valves, ESD valves, gauges, pumps/compressors, deluge and gas detection.
Stored-fluid properties and classification, required working inventory/autonomy, receipt and dispatch rates, vapor pressure, temperature, corrosion, mixing/heating needs, site wind/seismic/geotechnical data, fire scenario and environmental rules. LPG composition, design pressure/temperature, inventory, filling ratio and fire case.
Design Basis, heat and material balance where applicable, PFD, P&ID, datasheets, line/equipment lists, layout and 3D interfaces, control and safeguarding documents, inspection plan, operating and commissioning procedures.
Hazard review, alarms and interlocks, relief/vent/drain philosophy, hazardous-area classification, maintainable isolation, fire protection, emergency shutdown interfaces and environmental controls.
Propane, butane, mixed LPG and pressurized refinery products.
ASME VIII, API 2510, NFPA 58, API 520/521; EN 13445/DIN or GOST pressure-vessel basis if selected.
ASME VIII, API 2510, NFPA 58, API 520/521; EN 13445/DIN or GOST pressure-vessel basis if selected.