PROCESS & OPERATING PHILOSOPHY
Feed, intermediate, finished-product, water and chemical storage. The operating sequence, recycle paths, start-up/shutdown cases and normal/turndown behavior are defined before equipment finalization.
UNKA ENGINEERINGEPC CONTRACTORAtmospheric and low-pressure tanks engineered for product, operating cycle and site loads.

Feed, intermediate, finished-product, water and chemical storage. The operating sequence, recycle paths, start-up/shutdown cases and normal/turndown behavior are defined before equipment finalization.
Fixed/floating roof tank, shell, bottom, roof, nozzles, vents, seals and access. Materials, design margins, maintainability, isolation, access, lifting and spare philosophy are coordinated with the approved operating cases.
Design/operating cases, fluid properties, corrosion allowance, materials, nozzle loads, wind/seismic data, transport limits, insulation and maintenance clearances.
Sizing, API calculations, drawings, settlement allowances, inspection and test package. The package also includes line/equipment lists, relief and utility summaries, layouts or 3D interfaces, vendor-document requirements, inspection plans and commissioning inputs as applicable.
Code-compliant relief interfaces, access and lifting provisions, inspection hold points, material traceability, qualified welding, NDE and pressure/leak testing.
Refineries, terminals, chemical plants and utility systems. Capacity, product quality, consumption and emissions commitments are confirmed only after the representative feed and project Design Basis are approved.
API 650/620/2000, NFPA and local seismic/wind codes. The contractual code basis is selected by destination and client specification. ASME/API/TEMA, EN/DIN and GOST/EAC requirements are not mixed without an approved code-equivalency and authority review.
API 650/620/2000, NFPA and local seismic/wind codes.